Hypios CI

Archived challenges

Quarry fines
Archived Challenge
Optimization of the Process of Connection/Disconnection of Slurry Pipes During the Construction of a Tunnel

Archive Optimization of the Process of Connection/Disconnection of Slurry Pipes During the Construction of a Tunnel Prime : 50 000€ Deadline : 18/05/2019 Description Background The Seeker is a tunnel boring machine that produces small diameter (600mm) underground structures with medium diameters (2600mm) based on prefabricated modules (concrete, GRP, sandstone or other composite materials).

Read More »
Chemistry
Archived Challenge
Treatment of Olfactory Nuisances

Archive Treatment of Olfactory Nuisances Prime : 30 000€ Deadline : 04/09/2017 Description The goal of the challenge is to find a solution to induce a notion of cleanliness in spaces of passage, thus making these spaces pleasant and increasing the satisfaction of the people that pass through.

Read More »
Capsule
Archived Challenge
Improving Gel Formulation Against Liquifying

Archive Improving Gel Formulation against Liquifying Prime : 30 000€ Deadline : 25/07/2018 Description What is The Problem? The seeker wants to Eliminate the decrease of the viscosity (less than 15%) during storage at ambient temperature relative humidity 55% around While keeping the same basic formulation of gel bait, containing: (the current formulation is based

Read More »
packaging
Archived Challenge
Innovative Packaging for Pest Control Product

Archive Innovative Packaging for Pest Control Product Prime : 35 000€ Deadline : 31/08/2018 Description What is The Problem? Some bait boxes are subject to porosity, water loss, fragility, stress cracking The seeker wants to (in this order): Stop all potentiality of porosity of the plastic material in order to avoid effects such as water

Read More »
en_USEnglish